BCF Issue Exchange Between Construction Coordination Tools

Pilot a BIM Collaboration Format exchange, preserve issue context across tools and verify closure against model versions.

Published · Example for training

When teams coordinate in different applications, emailing a screenshot makes the receiver reconstruct the problem. BIM Collaboration Format (BCF) gives compatible tools a way to exchange an issue's context, including viewpoints and references. The receiving team still needs access to the relevant models. Decide which system owns the record before people start updating copies.

Test one round-trip before widening access

Pick an issue with a clearly visible interface. Record the topic identifier, location, affected model revisions, owner, due date and success conditions. Agree on the BCF version and whether the team will use file exchange or a service. Ask a receiving user to open the viewpoint and confirm that the referenced components are selected and the scene is correctly aligned. Record which fields make the round trip. Status values, comments, attachments and permissions can behave differently between tools.

Worked example — rerouting a cable tray

A federated view shows a tray obstructing access to a damper. The coordinator sends the viewpoint with the two frozen model revisions and the clearance question. On import the receiving application can open the view but misses an element reference. The receiving designer adds a room and grid locator to the topic and confirms the model being reviewed. After the next exchange, the reviewer checks the revised geometry and access space with the responsible designer. Record the revisions checked and the closure basis in the authoritative issue. If the clearance decision is incomplete, keep it open.

Try an acceptance run before coordinating for real

File-based exchange is often enough for a small pilot. If several teams update topics at once, compare how a shared service handles identity, retention and access before rollout. Record the outcome for the specific tools and versions tested.

Video walkthrough

Look for how the viewpoint, affected elements and discussion travel with an issue. Recreate one exchange using two test models and compare the topic before and after import.

Watch: Watch the openBIM workflow on buildingSMART's BCF standard page

Sources

Continue with a practical example