Building Information Modeling (BIM) is not just about 3D design—it’s about integrated planning, real-time coordination, and reducing risk during execution. I use BIM tools and workflows to ensure that design intent is translated accurately on site.
• Clash Detection and Resolution
Using tools such as Navisworks Manage and Revit, I:
Detect clashes between systems (e.g. ductwork vs. beams)
Generate clash reports and assign issues to relevant disciplines
Monitor resolution status through BIM issue trackers
Validate constructability before procurement and installation
• Coordinating Multidisciplinary BIM Models
I work with architectural, structural, and MEP teams to:
Combine models into a single federated file
Ensure geometry, systems, and tolerances are aligned
Resolve spatial conflicts before they reach the field
Facilitate regular BIM coordination meetings with stakeholders
• BIM for Site Execution
I use BIM during construction to:
Communicate installation details clearly to site teams
Verify that on-site conditions match the model
Coordinate as-built updates and redlines
Identify discrepancies between execution and design in real time
• Model-Based Construction Planning
I support 4D (time) and 5D (cost) integration by:
Linking construction activities to model elements
Simulating construction sequences to anticipate conflicts
Using visual outputs for site logistics and stakeholder briefings
Enhancing understanding of staging, safety zones, and deliveries
🛠️ Tools and Skills Applied:
Tool/Skill | Purpose |
Autodesk Revit | Model review, element coordination, annotations |
Navisworks Manage | Clash detection and simulation |
Dynamo | Automating repetitive modeling and coordination tasks |
BIM 360 / Issue Trackers | Real-time communication across stakeholders |
🌟 Value Delivered
Through BIM coordination, I help deliver:
Fewer site-based errors and design-related delays
Faster decision-making with visual clarity
Improved collaboration between consultants, contractors, and field teams
A model-driven project that’s leaner, smarter, and better executed
🏗️ Real Projects
In Niayesh Mall, I used BIM to coordinate commercial unit layouts, HVAC systems, and ceiling grids across 75 units—avoiding dozens of onsite conflicts.
At Seoul Residential, I led clash detection reviews for structural and plumbing systems, resolving critical ceiling void conflicts prior to rough-in.