Oriole Way Residence
- Role
- Remote CPM & BIM Coordinator
- Location
- Los Angeles, California
- Involvement
- Jan — Jun 2024
Construction Project Management · Saeed Azarshab

My portfolio separates remote BIM and preconstruction coordination for US residential schemes from on-site construction management in Iran. I use that distinction to explain interfaces, information flow and delivery support without implying that I built or supervised those US projects on site.
For UK-facing delivery, I use the IMI Framework and BS EN ISO 19650 as references for structured information management. Standards and information protocols must be checked against the appointment and contract; BIM is not a universal legal requirement or an automatic certificate of Building Regulations compliance.
I bring BIM into the CPM decision cycle: define the information need, coordinate the model, assign issues, link programme and cost information, then verify closure. Repeatable checks and reporting are intended to reduce manual handovers and overlooked issues; automated outputs still need human review.
The records below show the stated role, scope and involvement. A project link does not prove every workflow or a quantified outcome.
Practical workflow reference. Project-specific roles and the current England regulatory context are described separately above.
• Clash Detection and Resolution
Detect clashes between systems (e.g. ductwork vs. beams)
Generate clash reports and assign issues to relevant disciplines
Monitor resolution status through BIM issue trackers
Validate constructability before procurement and installation
• Coordinating Multidisciplinary BIM Models
Combine models into a single federated file
Ensure geometry, systems, and tolerances are aligned
Resolve spatial conflicts before they reach the field
Facilitate regular BIM coordination meetings with stakeholders
• BIM for Site Execution
Communicate installation details clearly to site teams
Verify that on-site conditions match the model
Coordinate as-built updates and redlines
Identify discrepancies between execution and design in real time
• Model-Based Construction Planning
Linking construction activities to model elements
Simulating construction sequences to anticipate conflicts
Using visual outputs for site logistics and stakeholder briefings
Enhancing understanding of staging, safety zones, and deliveries
Tool/Skill | Purpose |
Autodesk Revit | Model review, element coordination, annotations |
Navisworks Manage | Clash detection and simulation |
Dynamo | Automating repetitive modeling and coordination tasks |
BIM 360 / Issue Trackers | Real-time communication across stakeholders |