Accurate scheduling is the backbone of timely project delivery. I create and manage construction timelines that align with contractual milestones, critical path activities, and real-world site constraints.
• Critical Path Analysis & Milestone Tracking
I identify critical path activities and monitor interdependencies to prevent delays. I set measurable milestones such as:
Excavation completion
Structural frame erection
MEP rough-ins
Final inspection sign-offs
This ensures that the project remains time-conscious at every phase.
• Developing the Master Schedule
Using tools like Microsoft Project and Primavera P6, I build comprehensive baseline schedules based on:
Contractual delivery deadlines
Construction methodology
Resource availability
Authority approval timelines
These schedules define all phases—from site preparation to handover.
• Delay Mitigation and Rescheduling
When site challenges or weather interruptions arise, I adapt the schedule by:
Re-sequencing non-critical tasks
Applying float strategically
Collaborating with subcontractors to recover lost time
• Look-Ahead Planning & Weekly Tracking
I generate 2-week and 4-week look-ahead schedules that sync with the overall master plan.
These short-term plans:
Help trade contractors plan workforce and material deliveries
Allow the site team to monitor daily progress and constraints
Identify delays before they escalate
🛠️ Tools and Skills Applied:
Tool/Skill | Application |
Microsoft Project | Gantt charts, baseline tracking, rescheduling |
Primavera P6 | Logic-based scheduling, progress curves |
Look-Ahead Sheets | Weekly site team coordination |
Progress Reporting | Earned value analysis, client updates |
🌟 Value Delivered
Professional scheduling ensures:
Predictable, transparent timelines
Better coordination across disciplines
Early detection and resolution of delays
A strong foundation for cost control and contract administration
🏗️ Real Projects
In the Qom Residential Project and Seoul Residential Building, I built and managed project schedules with multiple trades and permit-driven milestones.
Through proactive planning and regular schedule reviews, I helped both projects meet structural deadlines without cost overruns or lost productivity.