Oversight of technical documentation ensures that all construction drawings, specifications, and execution documents are accurate, compliant, and buildable. I manage the review, distribution, and control of documents to maintain consistency from design to delivery.
• Coordinating Method Statements and Technical Submittals
I evaluate technical submittals related to:
Construction materials
Installation procedures
Testing methods
Each submittal is checked against project specifications, national standards, and site logistics before approval.
• Reviewing IFC, Shop Drawings, and As-Builts
I perform detailed reviews of:
Issued for Construction (IFC) drawings
Shop drawings submitted by contractors
As-built drawings prepared during construction
My goal is to verify alignment with design intent, scope of work, and local regulatory standards.
• Ensuring Specification Compliance
I cross-reference all drawings and submittals with:
Project specifications
National building codes
Client requirements
Any deviation is flagged, corrected, and documented to avoid execution errors.
• Managing Document Control Protocols
I implement and maintain document tracking systems to manage:
Drawing revisions
RFI responses
Material submittal logs
Technical clarifications
This system ensures real-time access to updated documents by all stakeholders.
🛠️ Tools and Skills Applied:
Tool/Skill | Application |
Document Control Logs | Tracking drawing versions, submittals, RFIs |
Revit / AutoCAD | Reviewing plans and technical detailing |
Microsoft Excel / Word | Managing specs, approvals, and variation records |
QA/QC Checklists | Ensuring standard compliance in all documentation |
🌟 Value Delivered
Strong technical documentation oversight ensures:
Accurate and approved site instructions
Reduced design conflicts and variation claims
Full compliance with specifications and safety codes
Clear audit trail for regulatory authorities and client handover
🏗️ Real Projects
In the Qom Residential Project, I managed all construction documentation and ensured shop drawings matched structural and architectural intent.
At Niayesh Mall, I reviewed technical submittals across 75 commercial units and aligned documentation with changing tenant fit-out requirements — keeping approval turnaround time within two weeks.