Niayesh Mall — Commercial Delivery
- Role
- Senior Construction Project Manager
- Location
- Tehran, Iran
- Involvement
- Sep 2022 — Jan 2026
Construction Project Management · Saeed Azarshab

My documentation approach links the work package to current drawings, technical submissions and recorded decisions. Review and coordination are distinct from the designer’s approval, the client’s authorisation or an authority’s statutory decision.
For England, keep a traceable record of design decisions, compliance evidence and authorised changes. Higher-risk building work has additional information and change-control requirements; a digital model or shared folder alone is not proof that golden-thread duties have been met.
I connect model revisions, drawings, RFIs and technical submissions through a common record structure. Repeatable naming, revision checks and status reporting can reduce manual reconciliation; issue and approval status must remain explicit and reviewed by the responsible person.
The records below show the stated role, scope and involvement. A project link does not prove every workflow or a quantified outcome.
Practical workflow reference. Project-specific roles and the current England regulatory context are described separately above.
• Coordinating Method Statements and Technical Submittals
Construction materials
Installation procedures
Testing methods
Each submittal is checked against project specifications, national standards, and site logistics before approval.
• Reviewing IFC, Shop Drawings, and As-Builts
Issued for Construction (IFC) drawings
Shop drawings submitted by contractors
As-built drawings prepared during construction
• Ensuring Specification Compliance
Project specifications
National building codes
Client requirements
Any deviation is flagged, corrected, and documented to avoid execution errors.
• Managing Document Control Protocols
Drawing revisions
RFI responses
Material submittal logs
Technical clarifications
This system ensures real-time access to updated documents by all stakeholders.
Tool/Skill | Application |
Document Control Logs | Tracking drawing versions, submittals, RFIs |
Revit / AutoCAD | Reviewing plans and technical detailing |
Microsoft Excel / Word | Managing specs, approvals, and variation records |
QA/QC Checklists | Ensuring standard compliance in all documentation |