Niayesh Mall — Commercial Delivery
- Role
- Senior Construction Project Manager
- Location
- Tehran, Iran
- Involvement
- Sep 2022 — Jan 2026
Construction Project Management · Saeed Azarshab

I approach close-out as a coordinated record of completed work, outstanding items and information needed by the client. Testing, specialist certification, contractual completion and operational acceptance have different owners; coordinating them does not replace those appointments.
For England handover, distinguish Building Regulations completion, contractual completion and client acceptance. Assemble applicable fire-safety information, testing records, operation and maintenance information and the CDM health-and-safety file. Higher-risk building completion and information duties apply only where the project falls within that regime.
I link snag locations, asset information and close-out evidence back to the model and work package. Structured completeness checks can highlight missing manuals, certificates or unresolved issues before handover; record updates require validation against the installed work.
Start with one installed asset and follow its identifier through the record drawing, operation and maintenance information, and the receiving system. These downloadable working aids help organise that review; agree the required fields and acceptance criteria with the client and operator before using them on a project.
Explore the other construction and BIM templates, or discuss a construction project management or BIM role.
The records below show the stated role, scope and involvement. A project link does not prove every workflow or a quantified outcome.

Practical workflow reference. Project-specific roles and the current England regulatory context are described separately above.
• Coordinating Commissioning and Testing
HVAC, electrical, and plumbing systems
Fire alarms, sprinklers, and access control
Lifts, generators, and backup systems
• Managing Handover Documentation
As-built drawings and redlines
Operation & Maintenance (O&M) manuals
Warranty certificates
Compliance and testing records
These documents are organized for client reference, future maintenance, and regulatory archiving.
• Post-Occupancy Follow-Up and Maintenance Transition
Support the transition to facility operations
Coordinate post-occupancy defect resolution
Train client representatives on systems and maintenance cycles
Ensure feedback is captured for future project optimization
• Conducting Final Walkthroughs and Snag Rectification
Walkthroughs to identify outstanding works (snag list / punch list)
Coordination of trades to resolve issues
Follow-up inspections until all items are signed off
Tool/Skill | Purpose |
Snagging Software / Checklists | Documenting defects and verifying rectification |
Testing & Commissioning Logs | System performance and certification tracking |
Client Handover Packages | Ensuring complete and organized documentation |
Maintenance Coordination | Post-handover support and knowledge transfer |