Tavanir Office Building
- Role
- Construction Project Manager
- Scale
- 10 offices / 36 parking spaces
- Involvement
- Oct 2019 — Aug 2022
Construction Project Management · Saeed Azarshab

I approach material coordination through specifications, samples, delivery requirements and installation interfaces. Technical acceptance belongs to the appropriately authorised party; a product substitution needs a recorded assessment, not an assumption of equivalence.
In England, materials and workmanship must satisfy the applicable requirements, including Regulation 7 and project-specific fire, structural and envelope performance. A proposed substitution needs appropriate supporting evidence and an authorised assessment, not simply a matching model description.
I link material requirements to model locations, submissions, samples and inspection records. Structured comparisons and missing-information checks are useful automation candidates; acceptance, substitutions and concealed-work release still require the appointed reviewers.
The records below show the stated role, scope and involvement. A project link does not prove every workflow or a quantified outcome.
Practical workflow reference. Project-specific roles and the current England regulatory context are described separately above.
• Evaluating Material Samples and Mock-Ups
Finish quality
Color and texture coordination
Installation feasibility on site
Compatibility with adjacent systems and materials
• Reviewing Technical Datasheets and Compliance
Alignment with project specifications
Compliance with national and international codes (e.g., fire rating, thermal performance, load capacity)
Environmental and site-specific suitability (e.g., moisture resistance, coastal conditions)
• On-Site Material Verification
Compliance with approved samples
No substitution without approval
Proper storage, handling, and pre-installation conditions
• Supplier and Manufacturer Coordination
Clarify performance details
Validate warranties and certification
Align delivery timelines with the project schedule
Ensure batch consistency and long-term availability
Tool/Skill | Application |
Material Submittal Log | Tracking sample reviews, approvals, and status |
Specification Checklists | Cross-checking product features with project specs |
Site Inspection Reports | Recording conformity/non-conformity issues |
Supplier Coordination | Lead times, warranty, and compliance management |