Tavanir Office Building
- Role
- Construction Project Manager
- Scale
- 10 offices / 36 parking spaces
- Involvement
- Oct 2019 — Aug 2022
Construction Project Management · Saeed Azarshab

The Tavanir record describes coordination between the structural engineer, water authority and site team around groundwater-related requirements. This supports an interface-management example in Iran, not a claim of UK planning, building-control or statutory sign-off experience.
My England-focused reference framework separates planning permission from Building Regulations approval. Building Regulations 2010, as amended, set requirements; Approved Documents give guidance, not the only possible compliance route. Higher-risk building work has a separate BSR process. Check current commencement dates and transitional rules for the actual project.
I organise requirements, submissions, model-linked evidence and authority comments in a traceable approval matrix. Automated status checks can flag missing records or overdue actions, but only the authorised body or appointed decision-maker can grant approval; a clash-free model is not a compliance certificate.
The records below show the stated role, scope and involvement. A project link does not prove every workflow or a quantified outcome.
Practical workflow reference. Project-specific roles and the current England regulatory context are described separately above.
• Preparing and Submitting Documentation
Building permit applications
Structural and architectural design packages
Fire strategy and evacuation plans
Compliance certificates and technical reports
• Coordinating with Local Authorities
Municipal planning departments
Fire safety and environmental agencies
Utility companies (water, electricity, gas)
Building inspection units
This ensures proper approvals at each project phase — from permits to occupancy.
• Ensuring Code and Regulation Compliance
National Building Codes
Energy efficiency and accessibility regulations
Environmental and waste management policies
Any project-specific planning conditions
Non-conformance is documented, reported, and corrected promptly.
• Managing Site Inspections and Certifications
Excavation and shoring
Structural frame sign-off
HSE audits
Final handover clearance
Tool/Skill | Purpose |
Permit Registers | Tracking applications, approvals, and expiry dates |
Inspection Logs | Documenting authority visits and compliance outcomes |
Regulatory Checklists | Ensuring site readiness for audits and certifications |
Stakeholder Liaison Skills | Facilitating dialogue between authorities and site teams |