Insights by Saeed Azarshab

Construction Project Management & BIM Articles

England Building Regulations Library

Search 42 practical guides covering Approved Documents, building safety, CDM, planning, party walls and construction payment law. Find checklists and official sources.

Search the regulations library →

Project delivery, planning, evidence-based decisions and digital construction.

Construction workflows in practice

Ten guides for construction project managers, with worked examples, field checklists and video walkthroughs.

  1. Drawing Revision Control on Construction Sites

    Set up a drawing revision release process in a common data environment, check offline copies and keep superseded drawings away from workfaces.

  2. Construction RFI Workflow from Question to Site Closeout

    Write a decision-ready request for information and turn the response into controlled instructions for the site, procurement and programme teams.

  3. Submittal Reviews and Procurement Release in Construction

    Tie technical submittals to supplier lead times and make the handoff from review to purchase traceable.

  4. Inspection and Test Plans That Protect Construction Hold Points

    Build an inspection and test plan around release decisions, collecting usable field evidence before work is covered.

  5. BCF Issue Exchange Between Construction Coordination Tools

    Pilot a BIM Collaboration Format exchange, preserve issue context across tools and verify closure against model versions.

  6. Two-Week Construction Lookahead and Constraint Planning

    Turn a master construction programme into a two-week plan with named constraints, reliable commitments and a feedback loop.

  7. Construction Variation Log from Site Event to Decision

    Keep the site event, notice, estimate, instruction and forecast treatment traceable in a construction change register.

  8. Reconcile BIM and Drawing Takeoff Quantities Before Tender

    Compare 2D and model-based quantities by scope, revision and units before releasing a tender quantity to the commercial team.

  9. Digital Handover Acceptance Test for Asset Information

    Test if a facilities team can actually use a construction handover package, including asset labels, permissions and evidence links.

  10. Golden Thread Change Evidence on Higher-Risk Building Projects in England

    Structure a record of a design or construction change so a reviewer can find the decision, revisions and evidence for an applicable project in England.

Latest insights

Latent Conditions and Decisions

A hidden condition is not just a technical finding. It is a project decision waiting to be made. In our published study of the Zahir-ol-Islam House, incomplete historical records and unexpected site discoveries complicated the interpretation of the building.

Read More →

Define Before Evaluate

Before asking whether a plan worked, I want to know what we agreed to measure. A shorter programme is not automatically a better programme. It may be working with different scope, assumptions or acceptance criteria.

Read More →

Recovery That Can Be Delivered

An earlier date is not a recovery plan. When I look at an activity that has been moved forward, I want to know what changed to make that earlier start possible.

Read More →

Before the Commitment

The question is not just “When will we finish?” It is “What must remain true for us to finish then?”

Read More →

One Building, Four Phases

One building. Four construction phases. A very different basis for planning. Our study of the Zahir-ol-Islam House in Tehran found evidence suggesting that the building had developed through four stages: an initial ground-level structure, a later basement, further basement expansion, and additions to the north and south.

Read More →

From Model to Decision

A model can be coordinated. The site can still be unready.

Read More →

Why I Built It — Mehraz Negar

I built a construction-management platform. But the real design problem was not the dashboard. It was the gap between having information and making a decision someone can act on.

Read More →

BIM & construction management guides

BIM Workflow for Construction Project Managers

BIM project management · 11 min read

Read More →

4D BIM Scheduling and Site Control

BIM project management · 10 min read

Read More →

BIM Execution Plan for International Projects

BIM project management · 12 min read

Read More →

BIM Clash Detection & Coordination

BIM coordination · 9 min read

Read More →

5D BIM Cost Estimation and Change Control

Cost and project controls · 10 min read

Read More →

BIM Asset Information and Digital Handover

Digital handover · 10 min read

Read More →

Practical BIM templates and checklists

Choose the task you need to complete. Read its guide for the review criteria, or download an existing CSV file directly. No registration is required.

These original review aids contain illustrative examples or blank result fields. Replace example data with verified project records, agree the acceptance criteria with the responsible team and use the accompanying guide. A completed template does not itself approve a design or demonstrate regulatory compliance.

Earlier writing: Level of Development in BIM.