Led selected commercial fit-out and public-realm workstreams, coordinating contractors, consultants, suppliers and client representatives. The Level -1 Food Hall comprises 75 units across approximately 5,500 m². The overview records portfolio evidence without extending the claim to the entire mall.
Managed delivery workstreams for a steel-frame office and commercial building, including groundwater-related early works coordinated with the engineer, water authority and site team.
Coordinated civil works from deep excavation and foundations through steel erection, metal-deck floors and façade works, connecting technical information, access and sequencing with site execution.
Coordinated sequencing and interfaces between villa construction, the pool, external works and landscape packages. These portfolio visuals are illustrative coordination studies, not documentary construction records.
Coordinated approximately 1,250 m² of refurbishment in an operational hospital, including phased work zones, contractor access, material movement, dust and noise controls and close-out.
Coordinated residential refurbishment from strip-out and existing-condition review through services, joinery, interior finishes and completion. Comparative and illustrative material is identified by its captions.
Oversaw seismic-retrofitting works and coordinated restoration execution with heritage specialists, structural engineers and site teams. The project also informed later peer-reviewed heritage research.
Heritage restoration and seismic retrofit coordinated with engineers, architects and specialist artisans to stabilise structure, façade and interior fabric.
Supported remote preconstruction and BIM coordination for a multi-level hillside residence. Drawings are marked as preliminary or not-for-construction where applicable; local supervision and approvals remained with the US team.
Supported remote drawing and BIM coordination for a timber-frame residence, tracking RFIs, design clarifications and approved information into coordination and programme records.
Reviewed drawing and model interfaces for concrete-basement and mixed timber-and-steel upper construction, coordinating model-to-site discrepancies from reported dimensions, photographs and video.
Supported remote planning and BIM coordination for a residential estate, reviewing long-lead procurement constraints, dependencies, early-release priorities and resequencing options.
A bilingual web-based platform designed to connect WBS management, dependencies, critical-path tracking, BIM coordination, issues, quality records and project documents. Interface visuals use demonstration data.
Published heritage research and ongoing applied construction-management studies, including cost and schedule forecasting and OpenBIM-to-CPM scheduling research. Visuals are illustrative workflows.