Managed restoration and seismic-reinforcement coordination at Bagh-e Melli Gate. The scope connected structural interventions with the preservation of original architectural elements in the historic gateway.
My role: Construction Project Manager. Managed restoration and seismic-reinforcement coordination at Bagh-e Melli Gate. The scope connected structural interventions with the preservation of original architectural elements in the historic gateway.
The challenge
Structural reinforcement needed to be considered together with preservation of the gateway’s original architectural elements.
My actions & decisions
I coordinated execution interfaces between seismic interventions and heritage restoration.
Result & delivery record
Project photographs document the historic gateway and selected architectural details supporting the stated restoration and reinforcement scope.
Project images & coordination records
The captions identify the material shown. Illustrative studies, preliminary drawings and demonstration interfaces remain labelled as such in the portfolio record.
Further reading on the coordination topics relevant to this portfolio record. These guides do not imply that every method or software tool was used on this project.
Explore controlled project information and traceable site execution.
Construction and architecture visual record
Images accompanying Bagh-e Melli Gate: Refurbishment & Heritage. The project description identifies Saeed Azarshab’s construction project management involvement; photographs, technical drawings and illustrations are identified individually in the captions.
تصاویر پروژهٔ Bagh-e Melli Gate در مجموعهٔ فعالیتهای سعید آذرشب؛ سوابق تصویری ساختوساز، اجرا و معماری. نقش مدیریت پروژه و نوع هر تصویر، نقشه یا تصویر توضیحی در متن و زیرنویس همان پروژه مشخص شده است.
Professional opportunities
Discuss a construction management role
Explore my construction-delivery case studies and professional background, download my portfolio or get in touch.