My role & scope
Construction Project Manager for delivery workstreams on a steel-frame office and commercial building with 10 offices and 36 parking spaces, October 2019–August 2022.
Saeed AzarshabCommercial & Office Projects
Construction management
Managed construction delivery workstreams for a steel-frame office and commercial building with 10 offices and 36 parking spaces. Early works required groundwater-related coordination between the structural engineer, water authority and site team, alongside construction sequencing.
Open interactive project gallery →
Construction management case study
Early-works constraints · technical coordination · authority interfaces · construction sequencing
Construction Project Manager for delivery workstreams on a steel-frame office and commercial building with 10 offices and 36 parking spaces, October 2019–August 2022.
Groundwater conditions created an early-works interface between the structural engineer, water authority and site team. Technical coordination had to inform the sequence of subsequent construction activities.
I connected the structural engineer, water authority and site team around groundwater-related requirements and construction sequencing, while managing the building’s delivery workstreams.
The project record follows foundation works and exterior construction through to completed office spaces. It demonstrates coordination of early technical constraints with the subsequent construction sequence.
Selected evidence
The portfolio presentation follows early works, façade installation and the completed building. The accompanying record explains the engineering interface and selected-package commercial result.
Source drawings and record excerpts are identified separately from portfolio summaries and presentation visuals. Presentation visuals explain the project setting, including reference-based or presentation views; they are not original site or approval records.

A visual reference for the early-works setting and foundation interfaces.
My role: I coordinated the structural engineer, water authority and site team around groundwater-related requirements and the agreed construction sequence.
Portfolio pp. 21–22 · Tavanir delivery
Open image at full size ↗
The façade-stage view illustrates the interface between envelope work and the subsequent finishes.
My role: I coordinated drawing revisions, trade interfaces and workmanship checks across the delivery workstreams.
Portfolio p. 22 · Construction Delivery & Technical Coordination
Open image at full size ↗
The completed exterior provides the architectural context for the office and commercial building.
My role: My delivery scope connected structure, façade, services and fit-out coordination.
Portfolio p. 21 · Tavanir Office Building
Open image at full size ↗The selected 18-month delivery record reports four direct reports, eight subcontractors and 35 peak operatives. Revised package budget: USD 8.45m; final package cost: USD 8.39m; USD 60k below the revised budget.
My role: I integrated the specialist-reviewed early-works solution into planning and contractor sequencing, alongside progress reporting and design-change review.
Portfolio pp. 07, 21–22 · Selected package, not the entire project period
The captions identify the material shown. Illustrative studies, preliminary drawings and demonstration interfaces remain labelled as such in the portfolio record.








Explore construction project management experience and BIM and project delivery guides.
Further reading on the coordination topics relevant to this portfolio record. These guides do not imply that every method or software tool was used on this project.
Understand how a structured coordination workflow can clarify interfaces between architectural finishes and building services.
Explore the relationship between specifications, supplier coordination and delivery records.
Read about linking model information with sequencing and progress review.
Images accompanying Tavanir Office Building: Commercial & Office Projects. The project description identifies Saeed Azarshab’s construction project management involvement; photographs, technical drawings and illustrations are identified individually in the captions.
تصاویر پروژهٔ Tavanir Office Building در مجموعهٔ فعالیتهای سعید آذرشب؛ سوابق تصویری ساختوساز، اجرا و معماری. نقش مدیریت پروژه و نوع هر تصویر، نقشه یا تصویر توضیحی در متن و زیرنویس همان پروژه مشخص شده است.
Professional opportunities
Explore my construction-delivery case studies and professional background, download my portfolio or get in touch.