Digital Handover Acceptance Test for Asset Information

Test if a facilities team can actually use a construction handover package, including asset labels, permissions and evidence links.

Published · Example for training

Test a handover package as the person who will use it after the project closes. The construction team may see every file in its own account while the operator sees expired links, missing attachments or asset names that do not match labels. Choose a small representative sample early and prove that the operator can complete a real task without assistance from the project administrator.

Design the acceptance check with the receiver

Select assets the facilities team will actually maintain. Agree required identifiers and records against the owner's information requirements. Use an account with ordinary receiver permissions to look up each asset by the tag the operator sees on site. Ask the receiver to locate the maintenance instructions, test or commissioning evidence and agreed warranty details. Try reopening the records from an export after logging out of the construction project. Record which tasks passed, which failed and who fixes the exceptions.

Worked example — finding a pump's commissioning record

A receiver finds pump P-07 in the export, but the commissioning report points to a construction folder they cannot access. The handover team puts the current authorised report in the agreed delivery location, updates the reference and checks that the asset identifier and report revision match. The receiver repeats the same lookup and confirms they can open the report. Include that result in the acceptance record and use the fault to sample other permissions.

Export, then prove the result is usable

Autodesk describes broader support for including referenced attachments in As-Built and Handover exports in its September 2026 release notes. Review the selected export options and the files produced. Run your receiver test on the delivered copy. The digital handover trial linked below provides a separate place to explore the shape of an asset register. Keep real client information out of training exercises.

Acceptance record

Video walkthrough

In the mobile demonstration, follow the route from a physical tag to an asset record. Repeat that journey with a receiver account and look for a missing link or inaccessible attachment.

Watch: Digital asset tracking and inventory demonstration