Saeed Azarshab

Approved Document S: Infrastructure for charging electric vehicles

Statutory guidance · England-focused reference · Editorial source review:

Part S concerns EV charge points and cable routes in applicable developments, material changes and major renovations. The requirements depend on building use, parking and the specific scope and exceptions. It does not mean every parking space at every existing building must immediately receive a charge point.

Independent explanation, not an official approval or project-specific legal/design advice.

When to use this guide

  • Planning parking for a relevant new residential, non-residential or mixed-use development
  • Considering a major renovation or material change within scope
  • Coordinating charge-point locations, cable routes and electrical supply

What to check

Use these prompts with the responsible project team. Ticking a box does not certify compliance.

You can tick these prompts while reviewing the project.

Download checklist (TXT)

Keep these records

  • Parking and charging-infrastructure design
  • Supply/installation and commissioning information
  • Evidence supporting applicable exceptions or cost-related provisions

Common mistakes

  • Assuming all existing parking spaces fall under an immediate installation duty.
  • Designing parking or landscaping before resolving the charging infrastructure interfaces.

When to get specialist help

Use competent electrical and infrastructure advice for supply capacity, installation and unclear applicability. This is not an electrical design calculator.

Scope and edition

Landing updated 17 April 2023 to add FAQs; guidance has February 2022 corrections. Scope and exceptions depend on project facts. Do not assume every parking space in every existing building requires a charge point. Check applicable development type, parking and exceptions in the official guidance.

EV charge points and cable routes for applicable new residential/non-residential/mixed-use buildings, material change to dwellings and major renovations.

Use the official source to check the current text, amendments not yet incorporated, commencement and project-specific transition. A published future edition is not automatically the rule applying to your work.

Official sources

  • GOV.UK — Approved Document SOfficial England guidance; check the applicable volume, edition and transition.https://www.gov.uk/government/publications/infrastructure-for-charging-electric-vehicles-approved-document-s
  • Official Approved Document S FAQshttps://www.gov.uk/guidance/approved-document-s-infrastructure-for-charging-electric-vehicles-frequently-asked-questions

Source links lead to external official websites. We provide original explanatory notes and do not reproduce paid standards.

About this library

Independent, plain-English reference notes by Saeed Azarshab. The library covers the 42 subjects listed here; it is not every law affecting construction, an official government publication or a project-specific compliance decision. Building Regulations, Approved Documents, workplace safety duties and planning permissions have different roles.

Editorial source review: . Check the current official text, commencement dates, outstanding amendments and transitional arrangements before relying on a requirement. Publication date is not necessarily the date a rule applies. A relevant competent professional or authority must resolve project-specific questions.

Sources and lawful reuse

Contains public sector information licensed under the Open Government Licence v3.0, except where otherwise stated. These are original practical summaries, with links to the official material. No government endorsement is implied. We do not host copies of proprietary BS, ISO or Eurocode standards, third-party diagrams or publisher layouts. Check each source’s rights notice before reuse.

Search works in your browser when JavaScript is enabled and also through the normal search form without JavaScript. Checklist progress uses this device’s browser storage only. No account or new tracking service is required. English is the reference language; translated search aliases are aids, not official translations.