Reconcile BIM and Drawing Takeoff Quantities Before Tender

Compare 2D and model-based quantities by scope, revision and units before releasing a tender quantity to the commercial team.

Published · Example for training

A model takeoff and a drawing takeoff can disagree even when both are measured correctly. One may include the base building while the other covers a fit-out boundary. They may use different units, phases or rules for deducting openings. Before releasing a tender quantity, make the two sources comparable and establish which source governs each item under the enquiry documents.

Create a comparison someone can repeat

Give each line a scope description, location, unit, source revision and agreed measurement basis. Confirm the model phase, linked files and category filters. On a PDF, verify the scale against a stated dimension on the actual sheet. Check a small sample against the underlying drawings and model objects before exporting totals. Model exclusions, manual allowances and unresolved assumptions belong in separate fields. That separation helps the estimator update only the affected lines after a revision.

Worked example — a partition package

On a training example, a model extract shows 112 linear metres and a drawing measure shows 118. The reviewer traces 4 metres to a shaft return present on a later drawing and 2 metres to a demolition item incorrectly included in the sheet measure. Check the authorised issue with the design team and correct the revision and scope filters. Allocate each wall type to the proper package before applying prices. Show the reconciliation, the accepted quantity basis and who reviewed it, so the next estimate starts from evidence rather than a mystery delta.

Control the handoff to commercial review

Forma Takeoff supports measurement against drawings and quantification from models. The software can help gather and group source data. Use project measurement rules to decide treatment of openings, tolerances, waste and quantities supplied by another package. Verify that a rate applies to the measured item and its unit before combining price and quantity. Preserve the input revision with each export to support comparison on later issues.

Release checks

Video walkthrough

Observe the difference between measuring from a sheet and counting model objects. Repeat one measurement in both views and record the measurement basis, exclusions and resolution.