When to use this guide
- Preparing a site or deciding whether ground investigation is needed
- Designing below-ground work, damp protection or ground-floor construction
- Investigating contamination, groundwater, damp or moisture at building interfaces
What to check
Use these prompts with the responsible project team. Ticking a box does not certify compliance.
You can tick these prompts while reviewing the project.
Keep these records
- Site investigation and contamination/moisture assessments
- Coordinated protection and drainage details
- Pre-cover inspections and verification of specified measures
Common mistakes
- Treating all damp as the same defect without checking its source.
- Using a membrane or coating as a substitute for understanding groundwater or contamination.
When to get specialist help
Seek appropriately competent ground, contamination or building-pathology advice when the cause or consequences are uncertain. A website cannot determine whether a site is safe for the proposed use.
Scope and edition
Landing published 3 September 2013; confirm applicability to project and current source before specifying. Site contamination and moisture risks need site-specific assessment. Do not treat damp-proofing details as a substitute for ground investigation.
Ground clearance/treatment, contaminants, subsoil drainage and resistance to moisture in floors, walls and roofs.
Use the official source to check the current text, amendments not yet incorporated, commencement and project-specific transition. A published future edition is not automatically the rule applying to your work.
Official sources
- GOV.UK — Approved Document COfficial England guidance; check the applicable volume, edition and transition.https://www.gov.uk/government/publications/site-preparation-and-resistance-to-contaminates-and-moisture-approved-document-c
Source links lead to external official websites. We provide original explanatory notes and do not reproduce paid standards.
About this library
Independent, plain-English reference notes by Saeed Azarshab. The library covers the 42 subjects listed here; it is not every law affecting construction, an official government publication or a project-specific compliance decision. Building Regulations, Approved Documents, workplace safety duties and planning permissions have different roles.
Editorial source review: . Check the current official text, commencement dates, outstanding amendments and transitional arrangements before relying on a requirement. Publication date is not necessarily the date a rule applies. A relevant competent professional or authority must resolve project-specific questions.
Sources and lawful reuse
Contains public sector information licensed under the Open Government Licence v3.0, except where otherwise stated. These are original practical summaries, with links to the official material. No government endorsement is implied. We do not host copies of proprietary BS, ISO or Eurocode standards, third-party diagrams or publisher layouts. Check each source’s rights notice before reuse.
Search works in your browser when JavaScript is enabled and also through the normal search form without JavaScript. Checklist progress uses this device’s browser storage only. No account or new tracking service is required. English is the reference language; translated search aliases are aids, not official translations.