When to use this guide
- Planning an extension, new drainage connection or drainage alteration
- Coordinating underground drainage before foundations and floor work
- Arranging access for inspection, testing and future maintenance
What to check
Use these prompts with the responsible project team. Ticking a box does not certify compliance.
You can tick these prompts while reviewing the project.
Keep these records
- Survey, drainage design and relevant consent correspondence
- Inspection and test records
- As-installed drainage and access information
Common mistakes
- Assuming building-control approval grants every sewer-related consent.
- Covering underground work before agreed checks and records have been completed.
When to get specialist help
Use competent drainage and structural input where existing sewers, uncertain routes or nearby foundations affect the proposal.
Scope and edition
Landing published 4 December 2010 and links its current document; confirm project-specific application and source before specifying. Consider external approvals and connection arrangements separately. Coordinate drainage layout and access before covering up work.
Foul drainage above and below ground, pipes, inspection access and drainage/waste arrangements.
Use the official source to check the current text, amendments not yet incorporated, commencement and project-specific transition. A published future edition is not automatically the rule applying to your work.
Official sources
- GOV.UK — Approved Document HOfficial England guidance; check the applicable volume, edition and transition.https://www.gov.uk/government/publications/drainage-and-waste-disposal-approved-document-h
Source links lead to external official websites. We provide original explanatory notes and do not reproduce paid standards.
About this library
Independent, plain-English reference notes by Saeed Azarshab. The library covers the 42 subjects listed here; it is not every law affecting construction, an official government publication or a project-specific compliance decision. Building Regulations, Approved Documents, workplace safety duties and planning permissions have different roles.
Editorial source review: . Check the current official text, commencement dates, outstanding amendments and transitional arrangements before relying on a requirement. Publication date is not necessarily the date a rule applies. A relevant competent professional or authority must resolve project-specific questions.
Sources and lawful reuse
Contains public sector information licensed under the Open Government Licence v3.0, except where otherwise stated. These are original practical summaries, with links to the official material. No government endorsement is implied. We do not host copies of proprietary BS, ISO or Eurocode standards, third-party diagrams or publisher layouts. Check each source’s rights notice before reuse.
Search works in your browser when JavaScript is enabled and also through the normal search form without JavaScript. Checklist progress uses this device’s browser storage only. No account or new tracking service is required. English is the reference language; translated search aliases are aids, not official translations.